LIFE SCIENCE PROJECT PROFILES

BIOPHARM CLEANROOM PROJECT REFERENCES

 

PROJECT NAME: Merck and Company, Elkton, VA
CONTRACT VALUE: $1,700,000 
CLASSIFICATION: Grade B, C, and Controlled/Unclassified
SCOPE: Design/Build Cleanroom Envelope
DESCRIPTION: Completed design of the cleanroom envelope and coordinated interstitial design with Jacobs Engineering, and managed construction of the cleanroom walls, floors, walkable ceilings, Auto doors, and protocol management for Merck’s HPV Purification expansion project.
TO BE COMPLETED: March 08

PROJECT NAME: Jacobs Modular for Genentech’s Toas Singapore Facility
CONTRACT VALUE: $2,700,000 
CLASSIFICATION: Grade C
SCOPE: Design/Build
DESCRIPTION: Contracted to complete detailed design and integrate the modular cleanroom wall and ceiling panels into the modular facility structure
TO BE COMPLETED: February 08

PROJECT NAME: Fleet Laboratories R&D Development Lab, Lynchburg, VA
CONTRACT VALUE: $1,300,000
CLASSIFICATION: Unclassified
SCOPE: Value Engineering and Construction Management
DESCRIPTION: Contracted to value engineer and construct a 1600 sq. ft. Process Development Laboratory including equipment facilitation and securing of all permits. Process systems include DI water system, process gases, chilled water system, waste neutralization, exhaust systems, mechanical platform, and Architectural finishes. 
TO BE COMPLETED: October 07

PROJECT NAME: Northwestern University (Contracted to Turner Construction Co.), Chicago, IL
CONTRACT VALUE: $400,000
CLASSIFICATION: BSL-3 Lab (Not Classified)
SCOPE: Envelope
DESCRIPTION: Complete design of the BSL-3 envelope, and construction of the modular walls and ceilings. Supervise construction of the process and HVAC Systems and coordinate all interstitial construction.
TO BE COMPLETED: October 07

PROJECT NAME: Confidential Client, Richmond, VA
CONTRACT VALUE: $2,200,000
CLASSIFICATION: Vaccine Lab (Unclassified) 
SCOPE: Design/Build and Construction Management
DESCRIPTION: Contracted to design and construct a 6000 sq. ft. Vaccine Laboratory including equipment facilitation and securing of all permits. Process systems include DI water system, process gases, chilled water system, waste neutralization, exhaust systems, steam boiler, casework, Cold Rooms, Biological Safety Cabinets, and Architectural finishes. 
TO BE COMPLETED: September 07

PROJECT NAME: db_Altea_Therapeutics1db_Altea_Therapeutics2db_Altea_Therapeutics3Altea Therapeutics
CONTRACT VALUE: $550,000
CLASSIFICATION: 10,000/100,000
SCOPE: Design/Build Cleanroom Envelope
DESCRIPTION: Completed design of the cleanroom envelope, and construction of the cleanroom including walls, floors and ceilings. Supervised construction of the process and HVAC Systems within the cleanroom perimeter.
COMPLETED: April 07

PROJECT NAME:  db_MedInstill2db_MedInstill1MedInstill Inc.  New Milford, CT
CONTRACT VALUE: $700,000
CLASSIFICATION: Grade C Space
SCOPE: Facility Retrofit Design/Build and Construction Management
DESCRIPTION: Contracted to design and construct a 5000 sq. ft. Grade “C” Manufacturing modular cleanroom suite and modification of the HVAC supply system. Process systems include chilled water system, exhaust systems and architectural finishes including flooring. 
COMPLETED: March 07

PROJECT NAME: Unither Pharmaceuticals, Silver Springs, MD
CONTRACT VALUE: $10,500,000
CLASSIFICATION: 10,000
SCOPE: Facility Infrastructure Design/Design/Build and Construction Management
DESCRIPTION: Contracted to design and construct a 5000 sq. ft. Cell Culture Suite including structural engineering and installation of the recirc fan support deck, and equipment facilitation including securing of all permits. Process systems include WFI water system, process gases, chilled water system, waste neutralization, exhaust systems, steam boiler, casework, and architectural finishes. 
COMPLETED: May 06

PROJECT NAME: Rutgers University (Contracted to Henderson Corporation.), Piscataway, NJ
CONTRACT VALUE: $200,000 
CLASSIFICATION: 1000/10,000
SCOPE: Design/Build Cleanroom Envelope
DESCRIPTION: Completed design of the cleanroom envelope for Rutgers’ Biomedical Engineering Building, and construction of the cleanroom including walls, floors, and ceilings.
COMPLETED: March 06

PROJECT NAME:  Merck & Company- Primaxin Facility, Elkton, VA
CONTRACT VALUE: $4,800,000
CLASSIFICATION: Grade A, B, & C Space
SCOPE: Facility Infrastructure Design/Design/Build and Construction Management
DESCRIPTION: Contracted to design and construct a 4000 sq. ft. Aseptic Fill Suite for Manufacturing, including modular cleanroom suite and installation of the recirc fan support deck, and equipment (RAB) facilitation including securing of all permits. Process systems include WFI water system, 20% Relative Humidity Control, chilled water system, exhaust systems, and architectural finishes. 
COMPLETED: October 05

PROJECT NAME:  Merck & Company- Component Preparation Room, Elkton, VA
CONTRACT VALUE: $1,000,000
CLASSIFICATION: Grade C Space
SCOPE: Facility Retrofit Design/Design/Build and Construction Management
DESCRIPTION: Contracted to design and construct a 1000 sq. ft. Grade “C” Manufacturing modular cleanroom suite and modification of the HVAC supply system. Process systems include chilled water system, exhaust systems and architectural finishes including flooring. 
COMPLETED: March 05

PROJECT NAME: Northwestern University (Contracted to Turner Construction Co.), Chicago, IL
CONTRACT VALUE: $550,000 
CLASSIFICATION: 100/10,000/100,000
SCOPE: Design/Build Cleanroom Envelope
DESCRIPTION: Completed design of the cleanroom envelope, and construction the cleanroom including walls, floors, and ceilings. Supervised construction of the process and HVAC Systems.
COMPLETED: October 04

PROJECT NAME: Patheon Pharmaceuticals (Contracted to Turner Construction Co.), Cinn, OH
CONTRACT VALUE: $800,000 
CLASSIFICATION: 100/10,000/100,000
SCOPE: Design/Build
DESCRIPTION: Completed design of the cleanroom envelope, and construction of the cleanroom walls, floors, walkable ceilings, Auto doors, and protocol management for Patheon’s Building 64 expansion project.
COMPLETED: September 04

PROJECT NAME: Glaxo Smith Kline- Project Lopez (Contracted to O’Neal Constructors), Memphis, TN
CONTRACT VALUE: $350,000 
CLASSIFICATION: 10,000/100,000
SCOPE: Cleanroom Envelope
DESCRIPTION: Construction of the cleanroom including walls, ceilings, doors, and interstitial systems for GSK’s cGMP facility expansion in Memphis, TN
COMPLETED: February 04

PROJECT NAME: Unither Pharmaceuticals, Silver Springs, MD
CONTRACT VALUE: $400,000
CLASSIFICATION: Unclassified (QA/QC Laboratory)
SCOPE: Design/Build and Construction Management
DESCRIPTION: Contracted to design and construct a 3000 sq. ft. Research Lab retrofit within the existing facility. Process systems include DI water, HVAC, Exhaust system, Laboratory Casework, Bio Safety Cabinets, Architectural Finishes, and Process Equipment Installation. 
COMPLETED: January 04

PROJECT NAME: db_cambrex1_sm.jpgspacerdb_cambrex2_sm.jpgspacerCambrex Biosciences, Baltimore, MD
CONTRACT VALUE: $3,200,000
CLASSIFICATION: Unclassified
SCOPE: Design/Build and Construction Management
DESCRIPTION: Contracted to design and construct an 11,000 sq. ft. Process Development Laboratory including equipment facilitation and securing of all permits. Process systems include DI water system, process gases, chilled water system, waste neutralization, exhaust systems, steam boiler, casework, Cold Rooms, Biological Safety Cabinets, Architectural finishes. 
COMPLETED: May 03

db_scheer1_sm.jpgdb_scheer2_sm.jpgdb_scheer3_sm.jpgdb_scheer4_sm.jpgPROJECT NAME: University Pharmaceuticals (Contracted to Scheer Partners), Baltimore, MD
CONTRACT VALUE: $550,000 
CLASSIFICATION: 100,000
SCOPE: Design/Build
DESCRIPTION: Completed design of the cleanroom envelope, and construction of the cleanroom including walls, floors, ceilings, process, and HVAC Systems.
COMPLETED: October 02

back to top »

PROCESS SYSTEMS & TOOL EXPERIENCE

PROJECT NAME: Duke University (CIEMAS), Durham, NC
CONTRACT VALUE: $1,200,000
CLASSIFICATION: N/A
SCOPE: Construction Management of Research Facility Tool Installation
DESCRIPTION: Contracted to complete tool PNID’s and detail the facility requirements for the Phase 1 tool ramp. Solicited, contracted, scheduled, and managed process, electrical, rigging, architectural, hi-purity testing, and fire protection subcontractors and interfaced with the facility user group.
TO BE COMPLETED: September 07

PROJECT NAME: Norfolk State University, Norfolk, VA
CONTRACT VALUE: $38,000
CLASSIFICATION: Nanotechnology Process Fab
SCOPE: Process Tool Layout, Process Utility Routing, P&ID’s, and Bid Packages
DESCRIPTION: Contracted to layout and coordinate the process tool systems including P&ID’s for their alpha tool set. Process systems include DI water system, process gases, chilled water system, acid exhaust w/scrubber, and solvent exhaust.
COMPLETED: July 2007

PROJECT NAME: UNC Phillips Lab, Chapel Hill, NC
CONTRACT VALUE: $28,000
CLASSIFICATION: Nanotechnology Process Fab
SCOPE: Process Tool Layout, Process Utility Routing, P&ID’s, and Bid Packages
DESCRIPTION: Contracted to layout and coordinate the process tool systems including P&ID’s for their alpha tool set. Process systems include DI water system, process gases, chilled water system, acid exhaust w/scrubber, and solvent exhaust.
COMPLETED: May 07

PROJECT NAME: UPENN Microfab
CONTRACT VALUE: $11,000
CLASSIFICATION: Budgeting Process Systems Design Contract (URS/AGI)
SCOPE: Budgeting for Process Infrastructure Upgrades and Process Utility Routing
DESCRIPTION: Contracted to provide budgeting during the design process for upgrade of the facility to meet updated code and user requirements.
COMPLETED: May 2007

PROJECT NAME: NanoOpto Corporation, Somerset, NJ
CONTRACT VALUE: $120,000
CLASSIFICATION: N/A
SCOPE: Design and Construction Management of Bay 4 Tool Installation
DESCRIPTION: Contracted to develop tool PNID’s and detail the facility requirements for the Bay 4 ALD tool ramp. Solicited, contracted, scheduled, and managed process, electrical, rigging, architectural, and hi-purity testing subcontractors and interfaced with the facility user group.
COMPLETED: November 05

PROJECT NAME:  Merck & Company- Primaxin Facility, Elkton, VA
CONTRACT VALUE: $500,000
CLASSIFICATION: IMA RAB Sterile Fill Line
SCOPE: Facility Infrastructure Design/Design/Build and Construction Management
DESCRIPTION: Contracted to provide a detailed scope and execution plan to install their 150 ft. process filling line manufactured by IMA. Scope included rigging of the line in to place through an engineered opening in the building, leveling, facilitation, and integration into the cleanroom facility. Process systems include WFI water system, electrical, process controls, exhaust systems including RABs, and architectural finishes. 
COMPLETED:  October 05

PROJECT NAME: Ziptronix Corporation, Morrisville, NC
CONTRACT VALUE: $150,000
CLASSIFICATION: N/A
SCOPE: Design and Construction Management of Fab 1 Phase 1 Tool Installation
DESCRIPTION: Contracted to develop tool PNID’s and detail the facility requirements for the Phase 1 tool ramp for. Solicited, contracted, scheduled, and managed process, electrical, rigging, architectural, and hi-purity testing subcontractors and interfaced with the facility user group.
COMPLETED: July 03

PROJECT NAME: Nitronex Corporation, Durham, NC
CONTRACT VALUE: $850,000
CLASSIFICATION: N/A
SCOPE: Design and Construction Management of Fab 2 Phase 1 Tool Installation
DESCRIPTION: Contracted to develop tool PNID’s and detail the facility modifications required for Phase 1 (MOCVD) tool ramp. Solicited, contracted, scheduled, and managed process, electrical, rigging, architectural, hi-purity testing, and interfaced with the facility user group.
COMPLETED: December 02

PROJECT NAME: ti_little1_sm.jpgspacerti_little2_sm.jpgspacerLittle Optics
CONTRACT VALUE: $330,000
CLASSIFICATION: AMAT P-5000 Tool Installation
SCOPE: Process Tool Layout, Process Utility Routing, Code Review, P&ID’s, and Bid Packages.
DESCRIPTION: Contracted to layout and coordinate the process tool systems for the AMAT P-5000 installation including P&ID’s and Silane and Hydrogen Bunkers, include DI water system, process gases, chilled water system, acid exhaust w/scrubber, and solvent exhaust.
COMPLETED: January 02

PROJECT NAME: Quantum Photonics
CONTRACT VALUE: $33,000
CLASSIFICATION: MOCVD and MBE Process Fab
SCOPE: Process Tool Layout, Process Utility Routing, P&ID’s, and Bid Packages.
DESCRIPTION: Contracted to layout and coordinate the process tool systems including P&ID’s for their alpha tool set. Process systems include DI water system, process gases, chilled water system, acid exhaust w/scrubber, and solvent exhaust.
COMPLETED: November 01

PROJECT NAME: RF Nitro, Charlotte, NC
CONTRACT VALUE: $57,000
CLASSIFICATION: Process Systems Design Contract (Shelco Inc.)
SCOPE: Process Tool Layout, Process Utility Routing, and Bid Packages.
DESCRIPTION: Contracted to layout and coordinate the process tool systems for their R&D Fab. Process systems include DI water system, process gases, process cooling water system, acid exhaust, and solvent exhaust.
COMPLETED: July 01

PROJECT NAME: ti_haleos1_sm.jpgspacerti_haleos2_sm.jpgspacerHaleos, Inc., Blacksburg, VA
CONTRACT VALUE: $400,000
CLASSIFICATION: N/A
SCOPE: Design/Build and Construction Management of Alpha Tool Set
DESCRIPTION: Contracted to design and manage the fit up of their Alpha Tool set at their new wafer fab in Blacksburg, VA. Process systems include DI water system, process gases, chilled water system, acid exhaust w/scrubber, and solvent exhaust.
COMPLETED: May 01

PROJECT NAME: RF Micro Devices, Greensboro, NC
CONTRACT VALUE: $520,000
CLASSIFICATION: N/A
SCOPE: Design and Construction Management of Fab 1 Phase 5 Tool Installation
DESCRIPTION: Contracted to develop tool PNID’s and detail the facility modifications required for tool ramp. Solicited, contracted, scheduled, and managed process, electrical, rigging, architectural, and hi-purity subcontractors and interfaced with the facility user group.
COMPLETED: November 00

PROJECT NAME: RF Micro Devices, Greensboro, NC
CONTRACT VALUE: $627,000
CLASSIFICATION: N/A
SCOPE: Design and Construction Management of Fab 1 Phase 4 Tool Installation
DESCRIPTION: Contracted to develop tool PNID’s and detail the facility modifications required for tool ramp. Solicited, contracted, scheduled, and managed process, electrical, rigging, architectural, and hi-purity subcontractors and interfaced with the facility user group.
COMPLETED: July 00

 

 

COMPANY REFERENCES

Hodess Construction Corporation- Blake Hodess- 508-695-1012 x-402

Covega- Jack Leek- 240-456-7123

NASA Glenn Research- Fran Borato- 216-433-5432

Infenera- Oliver King- 301-604-7668 X-225

DPR Construction- Frank Haughey - 949-309-7180

Merck & Co.- Tom Dombroski - 610-442-1406

Pepper Construction Company- Chris Rayner - 317-681-1000

Naval Research Labs- Darrell King- 202-767-2488

Duke University- Paul Manning- 919-660-4221

Turner Construction Company- Darien Grant- 703-928-2851

 

 

back to top »